LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2006 >> Altima SE-R, Standard >> Repair and Diagnosis >> Electrical >> Gauges >> Driver Information System >> Warning Chime >> Preliminary Check >> Inspection For Power Supply And Ground Circuit

Inspection For Power Supply And Ground Circuit

  1. CHECK FUSIBLE LINK 

    Check for blown BCM fusible link.

    FUSIBLE LINK INSPECTION

    Unit Power source Fusible link
    BCM Battery f

    Refer to , "WIRING DIAGRAM - CHIME - ".

    OK or NG 

    OK: GO TO 2.

    NG: If fusible link is blown, be sure to eliminate cause of problem before installing new fusible link. Refer to , "POWER SUPPLY ROUTING CIRCUIT ".

  2. POWER SUPPLY CIRCUIT CHECK 
    1. Disconnect BCM connector.
    2. Check voltage between BCM connector M20 terminal 70 and ground.
      BCM CONNECTOR AND GROUND VOLTAGE

      Terminals Voltage (Approx.)
      (+) (-)
      Connector Terminal
      M20 70 Ground Battery voltage
      Fig 1: Checking Voltage Between BCM Connector M20 Terminal 70 And Ground
      G04171156Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    OK: GO TO 3.

    NG: Check harness for open between BCM and fusible link.

  3. GROUND CIRCUIT CHECK 

    Check continuity between BCM harness connector M20 terminal 67 and ground.

    BCM CONNECTOR AND GROUND CONTINUITY

    Terminals Continuity
    (+) (-)
    Connector Terminal
    M20 67 Ground Yes
    Fig 2: Checking Continuity Between Ground And BCM Connector Terminal 67
    G04151991Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    OK: Inspection End.

    NG: Check harness ground circuit.