LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2006 >> Altima SE-R, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 378 (Engine Control System - VQ35DE) >> DTC P1706: PNP Switch >> Overall Function Check >> With GST

With GST

WARNING: This page is about a different car, the 2005 Nissan Altima. However, it is still accessible from the selected car via links, so may be relevant.
  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    ECM TERMINAL 102 (PNP SWITCH SIGNAL) AND GROUND VOLTAGE

    Condition (Shift lever) Voltage (Known good data)
    P or N position (A/T) Neutral position (M/T) Approx. 0V
    pt the above position BATTERY VOLTAGE (11 -14V)
  3. G, go to "DIAGNOSTIC PROCEDURE ".
    Fig 1: Checking Voltage Between ECM Terminal 102 (PNP Switch Signal) And Ground
    G02527303Courtesy of NISSAN MOTOR CO., U.S.A.