Component Description
When the shift position is P or N (A/T), Neutral (M/T) park/neutral position (PNP) switch is ON.
ECM detects the park/neutral position when continuity with ground exists.
When the shift position is P or N (A/T), Neutral (M/T) park/neutral position (PNP) switch is ON.
ECM detects the park/neutral position when continuity with ground exists.