Removal and Installation: Installation
Installation is in the reverse order of removal.
- Tighten the transverse link mounting bolts to specified torque. Refer to
"COMPONENTS ". During installation, the final tightening must be done with the vehicle in unladen* condition and the tires on the ground.
*: Fuel, engine coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.
CAUTION: Discard the old cotter pin and use a new cotter pin for installation of the lower ball joint nut. - Install wheel and tire. Refer to "ROTATION ".
- After installation, check the wheel alignment. Refer to "FRONT WHEEL ALIGNMENT ".