Retained Power Operation
WARNING: This page is about a different car, the 2003 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
When the ignition switch is turned to OFF position from ON or START position, power is supplied for 45 seconds
- to power window relay terminal 2
- from smart entrance control unit terminal 46.
Ground is always supplied
- to power window relay terminal 1
- through body grounds M4, M66, M111, M147 and M157.
When power and ground are supplied, power window relay continues to be energized, and the electrical sunroof can be operated.
When power is supplied, the electrical sunroof can be operated.
The retained power operation is canceled when the driver or passenger side door is opened.
RAP signal period can be changed by CONSULT-II. See CONSULT-II APPLICATION ITEMS .)