Removal and Installation: Installation
WARNING: This page is about a different car, the 2007 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
Installation is in the reverse order of removal.
- Tighten the bolts to specification.
Transfer bolt torque : 36 N.m (3.7 kg-m, 27 ft-lb)
- Fill the transfer with new fluid and check for fluid leakage and fluid level. Refer to "TRANSFER FLUID ".
- Start the engine for one minute. Then stop the engine and recheck the transfer fluid. Refer to "FLUID LEAKAGE AND FLUID LEVEL ".