Removal and Installation: Installation
WARNING: This page is about a different car, the 2006 Nissan Pathfinder. However, it is still accessible from the selected car via links, so may be relevant.
Installation is in the reverse order of removal.
- Tighten the bolts to specification.
Bolt length: 45 mm (1.77 in)
Transfer bolt torque: 36 N.m (3.7 kg-m, 27 ft-lb)
- Fill the transfer with new fluid. Refer to , "FILLING ".
- Check the transfer fluid. Refer to , "FLUID LEAKAGE AND FLUID LEVEL ".
- Start the engine for one minute. Then stop the engine and recheck the transfer fluid. Refer to , "FLUID LEAKAGE AND FLUID LEVEL ".