Storage Lid Full Close Detection Switch Check (Close Operate)

WARNING: This page is about a different car, the 2005 Nissan 350Z. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK STORAGE LID FULL CLOSE DETECTION SWITCH SIGNAL 
    1. Start engine.
    2. Operate soft top switch CLOSE, check voltage between Soft Top Control Unit Connector and ground.
    Fig 1: Soft Top Control Unit Connector B67 Terminal 25 (L/Y), 24 (G) & Ground Voltage Specifications Table
    G02404872Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    • OK: Storage lid full close detection switch is OK.
    • NG: GO TO 2.
    Fig 2: Soft Top Control Unit Connector B67 Terminal 25 (L/Y), 24 (G) & Ground Voltage Test
    G02404873Courtesy of NISSAN MOTOR CO., U.S.A.
  2. CHECK STORAGE LID FULL CLOSE DETECTION SWITCH CIRCUIT 
    1. Turn ignition switch OFF.
    2. Disconnect soft top control unit and storage lid switch (close) connector.
    3. Check the following.
      • Continuity between Soft Top Control Unit Connector B67 terminal 25 and storage lid switch LH (close) connector B64 terminal 1.
        • 25 (L/Y) - 1 (L/Y): Continuity should exist. 
      • Continuity between Soft Top Control Unit Connector B67 terminal 25 and ground.
        • 25 (L/Y) - Ground: Continuity should not exist. 
      Fig 3: Soft Top Control Unit Connector Terminal 25 & Storage Lid Switch LH (Close) Connector Terminal 1 & Ground Continuity Test
      G02404874Courtesy of NISSAN MOTOR CO., U.S.A.
    4. Check the following.
      • Continuity between Soft Top Control Unit Connector B67 terminal 24 and storage lid switch RH (close) connector B69 terminal 1.
        • 24 (G) - 1 (G): Continuity should exist. 
      • Continuity between Soft Top Control Unit Connector B67 terminal 24 and ground.
        • 24 (G) - Ground: Continuity should not exist. 

    OK or NG 

    • OK: GO TO 3.
    • NG: Repair or replace harness.
    Fig 4: Soft Top Control Unit Connector Terminal 24 & Storage Lid Switch RH (Close) Connector Terminal 1 & Ground Continuity Test
    G02404875Courtesy of NISSAN MOTOR CO., U.S.A.
  3. CHECK STORAGE LID FULL CLOSE DETECTION SWITCH GROUND CIRCUIT 

    Check continuity between storage lid switch (close) connector B64 (LH), B69 (RH) terminal 2 and ground.

    • 2 (B) - Ground: Continuity should exist. 

    OK or NG 

    • OK: GO TO 4.
    • NG: Repair or replace harness.
    Fig 5: Storage Lid Switch (Close) Connector B64 (LH), B69 (RH) Terminal 2 & Ground Continuity Test
    G02404876Courtesy of NISSAN MOTOR CO., U.S.A.
  4. CHECK SOFT TOP ROOF CONTROL UNIT OUTPUT SIGNAL 
    1. Connect soft top control unit connector.
    2. Start engine.
    3. Check voltage between Soft Top Control Unit Connector B67 terminal 24, 25 and ground.
      • 24 (G) - Ground: Approx. 5V 
      • 25 (L/Y) - Ground: Approx. 5V 

    OK or NG 

    • OK: Replace storage lid full close detection switch RH or LH.
    • NG: Replace soft top control unit.
    Fig 6: Soft Top Control Unit Connector B67 Terminal 24, 25 & Ground Voltage Test
    G02404877Courtesy of NISSAN MOTOR CO., U.S.A.