LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2004 >> Sentra SE-R >> Repair and Diagnosis >> External Pages >> Different car >> Section 1057 (Engine Control System) >> DTC P1706: PNP Switch >> Overall Function Check >> With GST

With GST

WARNING: This page is about a different car, the 2004 Nissan Quest. However, it is still accessible from the selected car via links, so may be relevant.
  1. Turn ignition switch ON.
  2. Check voltage between ECM terminal 102 (PNP switch signal) and ground under the following conditions.
    Fig 1: Checking Voltage Between ECM Terminal 102 And Ground
    G00775922Courtesy of NISSAN MOTOR CO., U.S.A.
    Fig 2: Displaying Conditions For Testing
    G00775921Courtesy of NISSAN MOTOR CO., U.S.A.
  3. If NG, go to DIAGNOSTIC PROCEDURE  .