Procedure B
- CHECK PNP SWITCH GROUND CIRCUIT FOR OPEN AND SHORT
- Turn ignition switch OFF.
- Disconnect PNP switch harness connector.
- Check harness continuity between PNP switch terminal 2 and ground.
Refer to Wiring Diagram .
Continuity should exist.
- Also check harness for short to power.
OK or NG
- OK : GO TO 3.
- NG : GO TO 2.
- DETECT MALFUNCTIONING PART
Check the following.
- Harness connectors F58, M70
- Harness for open or short between PNP switch and ground
- : Repair open circuit or short to power in harness or connectors.
- CHECK PNP SWITCH INPUT SIGNAL CIRCUIT FOR OPEN AND SHORT
- Disconnect ECM harness connector.
- Check harness continuity between ECM terminal 102 and PNP switch terminal 1. Refer to Wiring Diagram .
Continuity should exist.
- Also check harness for short to ground and short to power.
OK or NG
- OK : GO TO 4.
- NG : Repair open circuit or short to ground or short to power in harness or connectors.
- CHECK PNP SWITCH
Refer to "POSITION SWITCH ".
OK or NG
- OK : GO TO 5.
- NG : Replace PNP switch.
- CHECK INTERMITTENT INCIDENT
Refer to "TROUBLE DIAGNOSIS FOR INTERMITTENT INCIDENT ".
- >> INSPECTION END