LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2003 >> Sentra SE-R, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 1975 (Engine Mechanical - VK45DE) >> Engine Assembly >> Removal and Installation >> Removal >> Separation Work

Separation Work

WARNING: This page is about a different car, the 2005 Infiniti FX45. However, it is still accessible from the selected car via links, so may be relevant.
  1. Change engine slinger installing to cylinder head (right bank).
    NOTE: In order to keep secure position when hoisting engine.
    1. Slinger bolts: 
      1. :33.4 N.m (3.4 kg-m, 25 ft-lb) 
    Fig 1: Installing Cylinder Head (Right Bank)
    G02358471Courtesy of NISSAN MOTOR CO., U.S.A.
  2. Remove engine mounting insulators (RH and LH) under side nut with power tool.
  3. Lift with hoist and separate engine and transmission assembly from front suspension member.
    CAUTION:
    • Before and during this lifting, always make sure that any harnesses are left connected.
    • Avoid damage to and oil/grease smearing or spills onto engine mounting insulator.
  4. Remove alternator. Refer to "CHARGING SYSTEM ".
  5. Remove starter motor. Refer to "STARTING SYSTEM ".
  6. Separate engine from transmission assembly. Refer to "REMOVAL AND INSTALLATION (AWD MODELS) "
  7. Remove front final drive from engine. Refer to "FRONT FINAL DRIVE ASSEMBLY ".
  8. Remove engine mounting insulators (RH and LH) and brackets (RH and LH) from engine with power tool.
  9. Remove engine rear member and engine mounting insulator (rear) from transmission.