LEMON Manuals: Even more car manuals for everyone
Home >> Nissan-Datsun >> 2003 >> Murano SE, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery >> Removal And Installation >> Installation

Removal And Installation: Installation

Install in the reverse order of removal.

CAUTION: When installation, install positive battery terminal first.

Battery fix frame mounting nut

3.42 - 4.42 N.m (0.35 - 0.45 kg-m, 30 - 39 in-lb) 

Battery terminal nut

2.94 - 7.84 N.m (0.30 - 0.79 kg-m, 26 - 69 in-lb)