Removal And Installation: Notes
| Pre-removal operation | Post-installation operation |
|---|---|
|
|
| Removal steps | |||
|---|---|---|---|
| 1. | Idler pulley | ||
| 2. | A/C compressor and clutch assembly connector | ||
| <<A>> | >>C<< | 3. | A/C compressor and clutch assembly |
| 4. | Generator connector | ||
| 5. | Generator terminal | ||
| >>B<< | 6. | Grounding cable connection | |
| <<B>> | >>A<< | 7. | Generator assembly |