Removal And Installation: Notes
Pre-removal and Post-installation operation
- Engine Coolant Draining and Refilling (Refer to RADIATOR CAP OPENING PRESSURE CHECK ).
- Engine Cover Removal and Installation (Refer to ENGINE COVER ).
Pre-removal and Post-installation operation