LEMON Manuals
: Even more car manuals for everyone
Home
>>
Mitsubishi
>>
2016
>>
Outlander ES
>>
Repair and Diagnosis
>>
Engine Mechanical
>>
Mechanical
>>
Power Plant Mount
>>
Engine Mounting
>>
Removal And Installation
>>
2.4 L Engine
2.4 L Engine
Pre-removal Operation
Valve lift-ECU Removal (Refer to
VALVE LIFT-ECU
).
Post-installation Operation
Valve lift-ECU Installation (Refer to
VALVE LIFT-ECU
).
Fig 1: Identifying Engine Mounting Bracket Bolts With Torque Specifications
Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.