LEMON Manuals: Even more car manuals for everyone
Home >> Mitsubishi >> 2007 >> Raider SE >> Repair and Diagnosis >> Body & Frame >> Windows >> Body >> Frame & Bumpers >> Frame >> Specifications - Weld Process

Specifications - Weld Process

SPECIFICATIONS - WELDING PARAMETERS

WELDING PROCESS FLUX CORED ARC GAS METAL ARC (MIG)(1) SHIELDED METAL ARC (STICK)
Material Thickness  3.7 mm to 4.2 mm 3.7 mm to 4.2 mm 3.7 mm to 4.2 mm
Electrode Type  Lincoln Electrical Co. Product #: NR-211 MP (Do Not Substitute)  AWS ER70S-3 (Do Not Substitute)  (2) AWS E 7018
Electrodes Size Inches  .045 Tubular .035 Solid 3/32"
Electrode Stick Out  3/8" - 1/2" 1/2" - 5/8" N/A
Polarity  Electrode "-" Work Piece "+" Electrode "+" Work Piece "-" Electrode "+" Work Piece "-"
Shielding Gas  Self Shielded 75% Ar 25% CO2 Self Shielded
Gas Flow Rate  N/A 25 - 35 CFM N/A
Wire Feed Speed (inches per minute)  110 - 130 Vertical Down 70 - 90 Flat & Overhead 245 - 250 Vertical Down 210 - 225 Flat & Overhead N/A
Approximate Amperage 
Vertical  110 - 130 175 85 (3/32" Diameter)
Flat & Overhead  70 - 90 155 90 (3/32" Diameter)
Voltage  15 - 18 19 - 20 N/A
Direction of Welding 
Vertical  Vertical Down Hill (only) Vertical Down Hill (only) Vertical - Up Hill (only)
Flat & Overhead  Flat - Push or Drag Flat - Push or Drag Flat - Drag
(1) First choice - Gas Metal Arc Welding Process: Butt joints - apply two layers (passes) of weld metal. First pass should only fill approximately 1/2 the thickness. Vertical position welds - maintain electrode wire at leading edge of weld puddle while traveling down hill to produce maximum penetration into the sleeve. These techniques work for FCAW as well.
(2) E7018 new electrodes may be exposed to the atmosphere for up to ten hours with no harmful effect. Reconditioning schedules should come from the manufacturer.