>> B<< Transmission Control Cable Assembly Installation
- Shift the selector lever to the "N" position.
- Place the transmission side lever in the "N" position.
- Connect the transmission control cable to the selector lever.
- Connect the upper lever to the transmission control cable.
- Temporarily tighten the nut while pressing the transmission control upper lever lightly in the direction of the arrow.
- Tighten the nut with the specified torque.
Courtesy of MITSUBISHI MOTOR SALES OF AMERICA.
Tightening torque: 24 N.m (18 ft-lb)