27 10 010 Removing And Installing Transfer Box (ATC 350)
Special tools required:
Failure to comply with this requirement will result in serious damage to the transfer box!
Necessary preliminary work:
- Disconnect BATTERY EARTH LEAD .
- Remove underbody protection.
- Remove complete exhaust system . See 18 00 020 REMOVING AND INSTALLING COMPLETE EXHAUST SYSTEM (N55) or 18 00 020 REMOVING AND INSTALLING COMPLETE EXHAUST SYSTEM (N63) .
- Remove heat shields.
- Disconnect PROPELLER SHAFT at gearbox, release center mount.
- Tie back propeller shaft to underbody.
- Important:
- An excessive deflection angle of the propeller shaft may damage the joint/propeller shaft!
- Support gearbox with jack when removing the transfer box.
Release screws.
Tightening torque: 26 11 7AZ .
Remove front propeller shaft at output flange of transfer box and tie to one side.
Installation note:
Replace screws.
Release screws (1).
Remove cooling air duct (2).
Undo bolts (1) for gearbox mount.
Tightening torque: 22 32 10AZ .
Release screws.
Remove transmission cross member.
Tightening torque: 22 32 3AZ .
Tightening torque: 22 32 6AZ .
Disconnect connector (1) from transfer box control unit (linear force module) (2).
Slightly lower gearbox.
Release screw connection of transfer box.
Tightening torque: 27 10 1AZ .
Remove transfer box.
Installation note:
Pay attention to dowel pin (1).
Grease dowel pin (1).
Apply a thin coat of grease to gearing.
Grease: WEICON ANTI-SEIZE.