LEMON Manuals: Even more car manuals for everyone
Home >> Mini >> 2012 >> Cooper Base, 2D Hatchback, Standard Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 2504 (Integrated Suspension Systems - Repair) >> Connecting Lines >> 37 13... Notes on fitting a new pipe or a screw connection

37 13... Notes on fitting a new pipe or a screw connection

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2014 BMW X6, 2013 BMW X6, 2012 BMW X6, 2011 BMW X6, and 2010 BMW X6. However, it is still accessible from the selected car via links, so may be relevant.
IMPORTANT: Do not kink, twist or crush lines.
Do not disassemble screw connection!

Fitting new screw connection: 

Insert complete new screw connection consisting of toothed ring (1), banjo bolt (2) and assembly plug (3) into air spring/pipe connection of air supply unit.

Tightening torque 37 12 3AZ .

Remove assembly plug (3).

Fig 1: Identifying Toothed Ring, Banjo Bolt And Assembly Plug
G04767262Courtesy of BMW OF NORTH AMERICA, INC.

Slide new pipe (1) into banjo bolt (2) up to marking.

Check installation position of pipe (1) by pulling back slightly.

NOTE: The toothed ring (3) has engaged correctly when the pipe (1) cannot be pulled back.
Fig 2: Identifying Pipe, Banjo Bolt And Toothed Ring
G04767263Courtesy of BMW OF NORTH AMERICA, INC.

Fitting new pipes: 

IMPORTANT: To avoid leaks in the air spring system, it is essential to avoid scratches on pipes in particular in the connection area!