LEMON Manuals: Even more car manuals for everyone
Home >> Mercury >> 2009 >> Sable Base, AWD >> Repair and Diagnosis (Single Page) >> Brakes >> Traction Control >> Anti-Lock Brake System - Vehicle Dynamic Systems >> Diagnostic Tests >> Anti-Lock Control >> Pinpoint Tests >> Pinpoint Test F: Poor Vehicle Tracking During Anti-lock Function >> Normal Operation

Normal Operation

The operating voltage required for ABS module, hydraulic pump and isolation valve operation is in a range between 10 and 16 volts.

Fused battery voltage is supplied to the ABS module by battery junction box (BJB) fuse 9 (40A) along circuit SBB09 (RD) and by BJB fuse 12 (20A) along circuit SBB12 (GN/RD). Fused ignition voltage is supplied to the ABS module by BJB fuse 38 (10A) along circuit CBB38 (GY/BU). Ground is provided along circuit GD120 (BK/GN).

This pinpoint test is intended to diagnose the following: