Pre-tensioner Seat Belt
WARNING: This page is about a different car, the 2016 Mazda CX-5. However, it is still accessible from the selected car via links, so may be relevant.
- Remove the following parts:
- Front scuff plate (See FRONT SCUFF PLATE REMOVAL/INSTALLATION .)
- Rear scuff plate (See REAR SCUFF PLATE REMOVAL/INSTALLATION .)
- B-pillar lower trim (See B-PILLAR LOWER TRIM REMOVAL/INSTALLATION .)
- Remove the pre-tensioner seat belt and connect the SST (Adapter harness) as shown in the figure. (See FRONT SEAT BELT REMOVAL/INSTALLATION .)
- Install the pre-tensioner seat belt.
- Connect the SST (Deployment tool) to the SST (Adapter harness) .
- Connect the SST (Deployment tool) to the battery. Connect the power supply red clip to the positive battery terminal, and the black clip to the negative battery terminal.
- Verify that the red lamp on the SST (Deployment tool) is illuminated.
- Verify that all persons are standing at least 6 m {20 ft} away from the vehicle.
- Press the activation switch on the SST (Deployment tool)
to operate (deploy) the pre-tensioner seat belt.
WARNING:
- The pre-tensioner seat belt is very hot immediately after it is operated (deployed). You can be burned. Do not touch the pre-tensioner seat belt for at least 15 min after deployment.
- Disconnect the SST (Deployment tool) from the SST (Adapter harness) .