PCM and generator shearing inspection
- Connect the M-MDS to the DLC-2.
- Inspect as follows:
PCM AND GENERATOR SHEARING INSPECTION PROCEDURE
| Step | Inspection | Action | ||||||
|---|---|---|---|---|---|---|---|---|
| 1 | Measure the generator terminal B voltage when the electrical loads (1) are on and off. | 15 V or more | Go to Step 2. | |||||
| 13-15 V | Normal (2) | |||||||
| 13 V or less | Go to Step 3. | |||||||
| 2 | Monitor the ALTT V PID using the M-MDS, (See ON-BOARD DIAGNOSTIC TEST
.) or measure the PCM 2AF terminal waveform using an oscilloscope. (See PCM INSPECTION
.) Is the value normal? |
Yes | Go to Step 4. | |||||
| No | Inspect the following, then repair or replace as necessary.
|
|||||||
| 3 | Monitor the ALTT V PID using the M-MDS, (See ON-BOARD DIAGNOSTIC TEST
.) or measure the PCM 2AF terminal waveform using an oscilloscope. (See PCM INSPECTION
.) Is the value normal? |
Yes | Go to Step 5. | |||||
| No | Inspect the following, then repair or replace as necessary.
|
|||||||
| 4 | Monitor the ALTF PID using the M-MDS, or calculate the duty value of the PCM terminal 2AA using an oscilloscope. Is the duty value 100%? | Yes | Replace PCM. | |||||
| No | Inspect the following, then repair or replace as necessary.
|
|||||||
| 5 | Monitor the ALTF PID using the M-MDS, or calculate the duty value of the PCM terminal 2AA using an oscilloscope. Is the duty value 0%? | Yes | Replace PCM. | |||||
| No | Inspect the following, then repair or replace as necessary.
|
|||||||
|
||||||||