LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2016 >> MX-5 Miata Club, Standard Trans >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Systems >> Main Fuse Removal/Installation

Main Fuse Removal/Installation

  1. Disconnect the negative battery cable. (See NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION .)
  2. Widen the main fuse cover in the direction of arrows (1) shown in the figure to detach the tabs of the main fuse cover from the main fuse, then lift up the main fuse cover in the direction of arrow (2).
    Fig 1: Lifting Up Main Fuse Cover
    G10955053Courtesy of MAZDA MOTORS CORP.
  3. Press the hook of the main fuse cover in the direction of arrow (3) in the figure to detach the hook of the main fuse cover from the main fuse, then remove the main fuse cover in the direction of arrow (4).
  4. Remove the nuts.
    Fig 2: Pressing Main Fuse Cover Hook
    G10955054Courtesy of MAZDA MOTORS CORP.
  5. Remove the wiring harness.
  6. Remove the main fuse.
  7. Install in the reverse order of removal.