LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2016 >> CX-9 Signature >> Repair and Diagnosis >> Engine Mechanical >> Engine Lubrication System >> Oil Cooler Removal/Installation >> Bracket No. 1 Installation Note

Bracket No. 1 Installation Note

  1. Temporarily tighten the bracket No. 1 bolts.
  2. Tighten the bolts in the order shown in the figure.
    Fig 1: Bracket Bolts Tightening Sequence
    G10946692Courtesy of MAZDA MOTORS CORP.

    Tightening torque 

    • 42-62 N. {4.3-6.3 kgf.m, 31-45 ft.lbf}