LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2016 >> 3 Sport, 4D Hatchback, Automatic Trans >> Repair and Diagnosis >> Electrical >> Body Electrical >> Power Systems >> Relay And Fuse Block Removal/Installation >> Installation

Relay And Fuse Block Removal/Installation: Installation

  1. Move the flathead screwdriver in the direction of the arrow (1) shown in the figure, and pull the wiring harness in the direction of the arrow (2) while pressing the stopper to detach the relay or fuse terminal from the stopper.
    Fig 1: Pulling Wiring Harness Using Flathead Screwdriver
    G10963779Courtesy of MAZDA MOTORS CORP.
  2. Relocate all relay and fuse terminals to the new relay and fuse block.
    CAUTION:
    • If terminals are installed incorrectly, it could damage electrical accessories and burn wiring harnesses. When relocating terminals after replacing the relay and fuse block, line up the relay and fuse blocks of old and news parts and always verify each of the wiring harnesses in the wiring diagram so that the installation positions are correct.
      Fig 2: Relocating All Relay And Fuse Terminals To New Relay And Fuse Block
      G10963780Courtesy of MAZDA MOTORS CORP.
    • A terminal disconnection could cause electronic components and the system to not operate normally due to poor contact. After terminal relocation, lightly pull the wiring harnesses to verify that they cannot be pulled out.
  3. Temporarily install the ground.
    Fig 3: Identifying Ground And Bolt Of Relay And Fuse Box
    G10963781Courtesy of MAZDA MOTORS CORP.
  4. Move the relay and fuse block middle cover in the direction of arrow shown in the figure and insert the relay and fuse block tab into the relay and fuse block middle cover.
    Fig 4: Moving Relay And Fuse Block Middle Cover
    G10963782Courtesy of MAZDA MOTORS CORP.
  5. Insert all the relay and fuse block tabs into the relay and fuse block middle cover and install the relay and fuse block middle cover.
  6. Insert the front wiring harness connector into the relay and fuse block middle cover.
    Fig 5: Identifying Front Wiring Harness Connector
    G10963783Courtesy of MAZDA MOTORS CORP.
  7. Move the front wiring harness connector in the direction of arrow shown in the figure to engage the front wiring harness connector tab with the relay and fuse block middle cover.
    Fig 6: Moving Front Wiring Harness Connector
    G10963784Courtesy of MAZDA MOTORS CORP.
  8. Install all the front wiring harness connectors to the relay and fuse block middle cover.
  9. Move the relay and fuse block lower cover in the direction of arrow shown in the figure and insert the relay and fuse block middle cover tab into the relay and fuse block lower cover.
    Fig 7: Inserting Relay And Fuse Block Middle Cover Tab Into Relay And Fuse Block
    G10963785Courtesy of MAZDA MOTORS CORP.
  10. Insert all the relay and fuse block middle cover tabs into the relay and fuse block lower cover and install the relay and fuse block lower cover.
  11. Install the wiring harness clip to the relay and fuse block lower cover.
    Fig 8: Installing Wiring Harness Clip To Relay And Fuse Block Lower Cover
    G10963786Courtesy of MAZDA MOTORS CORP.
  12. Install the bands shown in the figure.
    Fig 9: Identifying Relay And Fuse Block Band
    G10963787Courtesy of MAZDA MOTORS CORP.
  13. Insert the front wiring harness protector No. 2 into the stud bolt.
    Fig 10: Inserting Front Wiring Harness Protector No. 2 Into Stud Bolt
    G10963788Courtesy of MAZDA MOTORS CORP.
  14. Insert the front wiring harness protector No. 2 cap into the stud bolt.
    Fig 11: Inserting Front Wiring Harness Protector No. 2 Cap Into Stud Bolt
    G10963789Courtesy of MAZDA MOTORS CORP.
  15. Install the front wiring harness protector No. 2 clip to the engine mount.
    Fig 12: Installing Front Wiring Harness Protector No. 2 Clip To Engine Mount
    G10963790Courtesy of MAZDA MOTORS CORP.
  16. Insert the relay and fuse block into the stud bolt.
    Fig 13: Inserting Relay And Fuse Block Into Stud Bolt
    G10963791Courtesy of MAZDA MOTORS CORP.
  17. Install the nut and bolt.
    Fig 14: Identifying Nut And Bolt With Torque Specifications
    G10963792Courtesy of MAZDA MOTORS CORP.
  18. Connect the emission wiring harness connectors.
    Fig 15: Identifying Emission Wiring Harness Connectors
    G10963793Courtesy of MAZDA MOTORS CORP.
  19. Press the emission wiring harness into the relay and fuse block hook.
    Fig 16: Pressing Emission Wiring Harness Into Relay And Fuse Block Hook
    G10963794Courtesy of MAZDA MOTORS CORP.
  20. Remove the bolt temporarily tightened in Step  3 of [INSTALLATION].
  21. Install the multiplex slow blow fuse. (refer to MULTIPLEX SLOW BLOW FUSE REMOVAL/INSTALLATION .)
  22. Install the front body control module (FBCM). (refer to FRONT BODY CONTROL MODULE (FBCM) REMOVAL/INSTALLATION .)
  23. Install the relay and fuse block upper cover.
  24. Install the parts removed in Steps  2 and  3 in "REMOVAL". (refer to REMOVAL .)
  25. Perform the "Verify Relay and Fuse Block Replacement". (refer to VERIFY RELAY AND FUSE BLOCK REPLACEMENT .)
  26. Connect the negative battery cable. (refer to NEGATIVE BATTERY CABLE DISCONNECTION/CONNECTION [SKYACTIV-G 2.0, SKYACTIV-G 2.5] .)