Pinpoint Test 3: Transmission Control Switch (TCS) Does Not Operate Correctly
TRANSMISSION CONTROL SWITCH (TCS) DOES NOT OPERATE CORRECTLY - PINPOINT TEST 3
| PINPOINT TEST 3 | TCS DOES NOT OPERATE CORRECTLY | ||
|---|---|---|---|
| STEP | INSPECTION | ACTION | |
| 1 | TEST THE INSTRUMENT CLUSTER (IC)
|
Yes | See SYMPTOM TROUBLESHOOTING CHART - INSTRUMENT CLUSTER . |
| No | GO to the next step. | ||
| 2 | CHECK SJB FUSE 30 (5A)
|
Yes | GO to the next step. |
| No | GO to step 4. | ||
| 3 | TEST THE TCS POWER CIRCUIT FOR AN OPEN
|
Yes | GO to step 5. |
| No | REPAIR circuit CBP30 (Y/L). RECONNECT all components. TEST the system for normal operation. | ||
| 4 | TEST THE TCS POWER CIRCUIT FOR A SHORT TO GROUND
|
Yes | GO to step 6. |
| No | REPAIR circuit (Y/L). TEST the system for normal operation. | ||
| 5 | TEST THE TCS SIGNAL CIRCUIT FOR AN OPEN
|
Yes | GO to step 7. |
| No | REPAIR circuit BR/G. RECONNECT all components. TEST the system for normal operation. | ||
| 6 | TEST THE TCS SIGNAL CIRCUIT FOR A SHORT TO GROUND
|
Yes | GO to the next step. |
| No | REPAIR circuit (BR/G). TEST the system for normal operation. | ||
| 7 | TEST THE TCS
|
Yes | INSTALL a new PCM. See PCM REMOVAL/INSTALLATION - 2.5L/3.0L . TEST the system for normal operation. |
| No | INSPECT the selector lever wiring harness for damage and REPAIR as necessary. If the selector lever wiring harness is not damaged, INSTALL a new selector lever knob. See SELECTOR LEVER REMOVAL/INSTALLATION . TEST the system for normal operation. | ||