LEMON Manuals
: Even more car manuals for everyone
Home
>>
Mazda
>>
2011
>>
RX-8 R3, 1.3 2
>>
Repair and Diagnosis
>>
Body & Frame
>>
Ignition Switch/Steering Lock
>>
Power Systems
>>
Main Fuse Removal/Installation
>>
Notes
Main Fuse Removal/Installation: Notes
Disconnect the negative battery cable.
Remove the main fuse block cover.
Remove in the order indicated in the table in figure.
Fig 1: Main Fuse, Connector, Nut And Bolt With Torque Specifications
Courtesy of MAZDA MOTORS CORP.
Install in the reverse order of removal.