Normal Operation: Notes
When the ignition switch is placed in START, fused ignition voltage is sent to:
- Fuse 35 (10A) in the battery junction box (BJB) along circuit (W/O).
- Smart junction box (SJB) J2280e pin 1, along circuit (W/O).
- SJB J2208b pin 45, along circuit (W/O).
- PCM 0140-175b pin 7 along circuit (L/W).
- SJB J2280b pin 32, along circuit (L/W).