Main Relay Operation Inspection
- Verify that the main relay clicks when the ignition is switched to ON and then to off.
- If there is no operation sound, inspect the following:
- Main relay (See RELAY INSPECTION .)
- Wiring harness and connector between battery positive terminal and main relay terminal A
- Wiring harness and connector between PCM terminal 1AT and main relay terminal B
- If there is no operation sound, inspect the following: