LEMON Manuals: Even more car manuals for everyone
Home >> Mazda >> 2008 >> CX-9 Touring, 3.7 V, FWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 1 (Transfer Case) >> Transfer Removal/Installation >> Transfer Installation Note

Transfer Installation Note

WARNING: This page is about a different variant/trim than selected.
  1. Push the engine forward so that the front side of the transfer faces downward, then install the transfer.
  2. Install the transfer installation bolts.

    Tightening torque 

    90-100 N.m {9.2-10.1 kgf.m, 66.4-73.7 ft.lbf} 

    Fig 1: Identifying Front Side Of Transfer Faces
    G05508280Courtesy of MAZDA MOTORS CORP.
  3. Install the No.1 engine mount bolt and nut.

    Tightening torque 

    85.3-116.6 N.m {8.70-11.88 kgf.m, 63.0-85.9 ft.lbf} 

    Fig 2: Identifying No.1 Engine Mount Bolt And Nut
    G05508281Courtesy of MAZDA MOTORS CORP.
  4. Rotate the front stabilizer to the rear to set it in its original position.
    Fig 3: Rotating Front Stabilizer To Rear
    G05508282Courtesy of MAZDA MOTORS CORP.