Check Valve Inspection
- Remove the charge air cooler duct.
- Disconnect the vacuum hose connected between the check valve and the purge solenoid valve from the purge solenoid valve.
- Disconnect the vacuum hose connected between the check valve and the intake manifold from the intake manifold.
- Blow through the check valve and verify that air flows as specified.
- If not as specified, replace the check valve.
SPECIFICATION CHART
| Condition | Airflow | ||
|---|---|---|---|
| Air applied from port A to B | Yes | ||
| Air applied from port B to A | No(1) | ||
|
|||