PCM and Generator Shearing Inspection
- Connect the WDS or equivalent to the DLC-2.
- Inspect as follows:
PCM AND GENERATOR SHEARING INSPECTION TABLE
| Step | Inspection | Action | |||||
|---|---|---|---|---|---|---|---|
| 1 | Measure the generator terminal B voltage when the electrical loads (1) are on and off. | 15 V or more | Go to Step 2. | ||||
| 13-15 V | Normal (2) | ||||||
| 13 V or less | Go to Step 3. | ||||||
| 2 | Monitor the ALTT V PID using the WDS or equivalent, or measure the voltage of PCM terminal 2AJ using a tester. Is the voltage between 13 and 15 V? | Yes | Go to Step 4. | ||||
| No | PCM input error. | ||||||
| 3 | Monitor the ALTT V PID using the WDS or equivalent, or measure the voltage of PCM terminal 2AJ using a tester. Is the voltage between 13 and 15 V? | Yes | Go to Step 5. | ||||
| No | PCM input error. | ||||||
| 4 | Monitor the ALTF PID using the WDS or equivalent, or calculate the duty value of the PCM terminal 2AI using an oscilloscope. Is the duty value 100%? | Yes | PCM input error. | ||||
| No | PCM, generator, or both are not normal. | ||||||
| 5 | Monitor the ALTF PID using the WDS or equivalent, or calculate the duty value of the PCM terminal 2AI using an oscilloscope. Is the duty value 0%? | Yes | PCM input error. | ||||
| No | PCM, generator, or both are not normal. | ||||||
|
|||||||