Continuity Inspection
- Remove the CPP switch.
- Verify that the continuity between CPP switch terminals A and B is as indicated in the table.
- If there is no malfunction, perform the "CIRCUIT OPEN/SHORT INSPECTION ".
- If there is any malfunction, replace the CPP switch.
CPP SWITCH CONTINUITY SPECIFICATIONS
| Measurement condition | Continuity |
|---|---|
| Push the rod. | Continuity detected |
| Except above | No continuity |