LEMON Manuals
: Even more car manuals for everyone
Home
>>
Mazda
>>
2002
>>
MPV ES
>>
Repair and Diagnosis
>>
Engine Mechanical
>>
Mechanical
>>
Engine Mechanical (Service Information)
>>
Timing Chain Removal/Installation
>>
Engine Front Cover Installation Note
Engine Front Cover Installation Note
Apply a
6 mm {0.24 in}
dot of silicone sealant at the indicated location.
Fig 1: Applying Silicone Sealant For Engine Front Cover Installation
Courtesy of MAZDA MOTORS CORP.
Install the remaining bolts and studs, and then tighten all bolts and studs in the order shown.
Fig 2: Engine Front Cover Bolt Tightening Sequence
Courtesy of MAZDA MOTORS CORP.