Checking Choke Relay
- Disconnect connector from relay. Using an ohmmeter without power applied, connect leads between terminals 1 and 2. There should be continuity between terminals 1 and 2, but not between 3 and 4.
- Connect battery power to terminal 6 and ground terminal 5. Continuity should now exist between terminals 3 and 4, but not at terminals 1 and 2.