Inspection [12/2017 - ]: Procedure
- INSPECT HEIGHT CONTROL WAY
- Check the height control way output voltage.
Standard Voltage
Tester Connection Condition Specified Condition A42-2 (PAC2) -A42-3 (SHB) Apply 5 V between terminals 1 (SHG) and 3 (SHB). 0.5 to 4.5 V HINT:
- If a stable power supply is not available, connect 4 nickel-metal hydride batteries (1.2 V each) or equivalent in series.
- If the result is not as specified, replace the height control way.
*a Component without harness connected
(Height Control Way)
- Check the height control way output voltage.