Installation [10/2020 - 10/2023]: Procedure
- INSTALL FRONT STEERING CONTROL ECU
- Install the front steering control ECU with the 2 nuts.
Torque: 7.5 N.m (76 kgf/cm, 66 in.lbf)
- Connect the 4 connectors to the front steering control ECU.
- Return the floor carpet to its original position.
- Install the front steering control ECU with the 2 nuts.
- INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY
Refer to PROCEDURE - Step 15 [10/2020 - 10/2022] , or refer to PROCEDURE - Step 14 [10/2022 - 10/2023]
- INSTALL GLOVE COMPARTMENT DOOR PAD PLATE
Refer to PROCEDURE - Step 16 [10/2020 - 10/2022] , or refer to PROCEDURE - Step 15 [10/2022 - 10/2023]
- INSTALL LWR INSTRUMENT PANEL FINISH PANEL ASSEMBLY
Refer to PROCEDURE - Step 25 [10/2020 - 10/2022] , or refer to PROCEDURE - Step 24 [10/2022 - 10/2023]
- INSTALL LOWER NO. 1 INSTRUMENT PANEL PAD SUB-ASSEMBLY
Refer to PROCEDURE - Step 33 [10/2020 - 10/2022] , or refer to PROCEDURE - Step 32 [10/2022 - 10/2023]
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 36 [10/2020 - 10/2022] , or refer to PROCEDURE - Step 35 [10/2022 - 10/2023]
- INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY
Refer to INSTALLATION [10/2020 - ]
- CONNECT NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
- INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY
Refer to PROCEDURE - Step 11
- INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL
Refer to WORK PROCEDURE [10/2020 - 10/2022] , or refer to WORK PROCEDURE [10/2022 - 10/2023]
HINT:
When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.
- PERFORM VARIABLE GEAR RATIO STEERING SYSTEM CALIBRATION
Refer to CALIBRATION [12/2017 - 10/2023]