DTC B2353-87: Power Integration No. 2 System Missing Message; DTC B2362-87: Overhead Module Missing Message [10/2023 - ]: Procedure
- CHECK VEHICLE TYPE
Result:
B
See step 10
Result:
A
See step 2
- CHECK FOR DTC
- Check for DTCs.
Body Electrical > Main Body > Trouble Codes
Result
Result Proceed to B2353-87 and B2362-87 are output A B2353-87 is output B B2362-87 is output C
Result:
B
See step 6
Result:
C
See step 8
Result:
A
See step 3
- Check for DTCs.
- INSPECT MAP LIGHT ASSEMBLY
Pre-procedure1
- Disconnect the N7 map light assembly connector.
- Clear the DTCs.
Body Electrical > Main Body > Clear DTCs
Procedure1
- Check for DTCs.
Body Electrical > Main Body > Trouble Codes
Result
Result Proceed to B2353-87 and B2362-87 are output A B2362-87 is output B Post-procedure1
- None
Result:
B
REPLACE MAP LIGHT ASSEMBLY. Refer to REMOVAL [12/2017 - ]
Result:
A
See step 4
- CHECK SEMICONDUCTOR POWER INTEGRATION ECU
Pre-procedure1
- Disconnect the G97 semiconductor power integration ECU connector.
- Clear the DTCs.
Body Electrical > Main Body > Clear DTCs
Procedure1
- Check for DTCs.
Body Electrical > Main Body > Trouble Codes
Result
Result Proceed to B2352-87 and B2362-87 are output A B2353-87 is output B Post-procedure1
- None
Result:
B
REPLACE SEMICONDUCTOR POWER INTEGRATION ECU. Refer to REMOVAL [10/2023 - ]
Result:
A
See step 5
- CHECK HARNESS AND CONNECTOR (CXPI COMMUNICATION LINE)
Pre-procedure1
- Disconnect the G206 main body ECU (multiplex network body ECU) connector.
- Disconnect the N7 map light assembly connector.
- Disconnect the G97 semiconductor power integration ECU connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G97-7 (CXPI) - G206-13 (CXP2) Always Below 1 Ω G97-7 (CXPI) or G206-13 (CXP2) - Body ground Always 10 kΩ or higher Result
Proceed to OK NG - None
Post-procedure1
Result:
OK
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [10/2023 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR POWER INTEGRATION ECU POWER SOURCE CIRCUIT)
Pre-procedure1
- Disconnect the A67 and G97 semiconductor power integration ECU connectors.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G97-13 (GND1) - Body ground Always Below 1 Ω - Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition A67-1 (+B) - Body ground Always 11 to 14 V G97-9 (IG) - Body ground Ignition switch ON 11 to 14 V G97-9 (IG) - Body ground Ignition switch off Below 1 V Result
Proceed to OK NG Post-procedure1
- None
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 7
- Disconnect the A67 and G97 semiconductor power integration ECU connectors.
- CHECK HARNESS AND CONNECTOR (NO. 2 SEMICONDUCTOR POWER INTEGRATION ECU - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
Pre-procedure1
- Turn the ignition switch off.
- Disconnect the cable from the negative (-) battery terminal.
- Disconnect the G97 semiconductor power integration ECU connector.
- Disconnect the G206 main body ECU (multiplex network body ECU) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition G97-7 (CXPI) - G206-13 (CXP2) Cable disconnected from negative (-) battery terminal Below 1 Ω Result
Proceed to OK NG Post-procedure1
- None
Result:
OK
REPLACE SEMICONDUCTOR POWER INTEGRATION ECU. Refer to REMOVAL [10/2023 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (MAP LIGHT ASSEMBLY POWER SOURCE CIRCUIT)
Pre-procedure1
- Disconnect the N7 map light assembly connector.
Procedure1
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition N7-19 (+B) - Body ground Always 10.5 to 16 V*1
11 to 14 V*2*1: w/ Stop and Start System
*2: w/o Stop and Start System
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N7-22 (GND) - Body ground Always Below 1 Ω Result
Result Proceed to OK A NG (+B terminal) (w/ Stop and Start Sytem) B - NG (Other terminal) (w/ Stop and Start Sytem)
- NG (w/o Stop and Start Sytem)
C Post-procedure1
- None
Result:
B
GO TO APPROPRIATE STOP AND START SYSTEM
Result:
C
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
A
See step 9
- Disconnect the N7 map light assembly connector.
- CHECK HARNESS AND CONNECTOR (MAP LIGHT ASSEMBLY - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
Pre-procedure1
- Turn the ignition switch off.
- Disconnect the cable from the negative (-) battery terminal.
- Disconnect the N7 main body ECU (multiplex network body ECU) connector.
- Disconnect the G206 main body ECU (multiplex network body ECU) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N7-20 (MPX) - G206-13 (CXP2) Cable disconnected from negative (-) battery terminal Below 1 Ω Result
Proceed to OK NG Post-procedure1
- None
Result:
OK
REPLACE MAP LIGHT ASSEMBLY. Refer to REMOVAL [12/2017 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- CHECK HARNESS AND CONNECTOR (MAP LIGHT ASSEMBLY - MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU))
Pre-procedure1
- Disconnect the N7 main body ECU (multiplex network body ECU) connector.
- Disconnect the G206 main body ECU (multiplex network body ECU) connector.
Procedure1
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N7-20 (MPX) - G206-13 (CXP2) Always Below 1 Ω Result
Proceed to OK NG Post-procedure1
- None
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 11
- CHECK HARNESS AND CONNECTOR (MAP LIGHT ASSEMBLY POWER SOURCE CIRCUIT)
Pre-procedure1
- Disconnect the N7 map light assembly connector.
Procedure1
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition N7-19 (+B) - Body ground Always 10.5 to 16 V*1
11 to 14 V*2*1: w/ Stop and Start System
*2: w/o Stop and Start System
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N7-22 (GND) - Body ground Always Below 1 Ω Result
Result Proceed to OK A NG (+B terminal) (w/ Stop and Start Sytem) B - NG (Other terminal) (w/ Stop and Start Sytem)
- NG (w/o Stop and Start Sytem)
C Post-procedure1
- None
Result:
B
GO TO APPROPRIATE STOP AND START SYSTEM
Result:
C
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
A
See step 12
- Disconnect the N7 map light assembly connector.
- CHECK MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)
Pre-procedure1
- Disconnect the N7 map light assembly connector.
Procedure1
- Using an oscilloscope, check the waveform.
OK
Tester Connection Switch Condition Specified Condition G206-13 (CXP2) - Body ground Ignition switch ON Pulse generation Result
Proceed to OK NG - None
Post-procedure1
Result:
OK
REPLACE MAP LIGHT ASSEMBLY. Refer to REMOVAL [12/2017 - ]
Result:
NG
REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU). Refer to REMOVAL [10/2023 - ]
- Disconnect the N7 map light assembly connector.