Installation [09/2015 - ]: Procedure
- INSTALL SPARK PLUG
- Install the 8 spark plugs.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
HINT:
Perform "Inspection After Repairs" after replacing the spark plug (Refer to INITIALIZATION [09/2015 - ] ).
- Install the 8 spark plugs.
- INSTALL IGNITION COIL ASSEMBLY
- Install the 8 ignition coils with the 8 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
HINT:
Perform "Inspection After Repairs" after replacing the ignition coil assembly (Refer to INITIALIZATION [09/2015 - ] ).
- Connect the 8 ignition coil connectors.
- Install the 8 ignition coils with the 8 bolts.
- CONNECT WATER A PIPE AND HOSE SUB-ASSEMBLY
- Connect the water A pipe and hose sub-assembly to the cylinder head cover with the 2 bolts.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Connect the water A pipe and hose sub-assembly to the cylinder head cover with the 2 bolts.
- INSTALL AIR CLEANER ASSEMBLY
Refer to PROCEDURE - Step 37
- INSTALL AIR CLEANER HOSE ASSEMBLY
Refer to PROCEDURE - Step 10
- INSTALL V-BANK COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 69
- INSTALL UPPER RADIATOR SUPPORT SEAL
Refer to PROCEDURE - Step 14