Starter Signal Circuit [10/2015 - ]: Procedure
- CHECK WHETHER ENGINE CAN BE CRANKED
- Check if the engine can be cranked.
Result
Result Proceed to Engine cannot be cranked A Engine can be cranked B
Result:
B
See step 13
Result:
A
See step 2
- Check if the engine can be cranked.
- READ VALUE USING TECHSTREAM (STARTER SIGNAL)
- Connect the Techstream to DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Powertrain / Engine / Data List / Primary / Starter Signal.
Powertrain > Engine > Data List
Tester Display Starter Signal - Check the value displayed on the Techstream when the engine switch is turned on (IG) and the engine is started.
OK
Condition Techstream Display (Starter Signal) Engine switch on (IG) OFF Engine started ON Result
Proceed to OK NG
Result:
NG
See step 10
Result:
OK
See step 3
- INSPECT ST RELAY
- Inspect the ST relay.
Refer to ON-VEHICLE INSPECTION [10/2015 - ]
Result
Proceed to OK NG
Result:
NG
REPLACE ST RELAY
Result:
OK
See step 4
- Inspect the ST relay.
- INSPECT STARTER ASSEMBLY
- Inspect the starter assembly.
Refer to INSPECTION [10/2015 - ]
Result
Proceed to OK NG
Result:
NG
REPLACE STARTER ASSEMBLY. Refer to REMOVAL [10/2015 - 09/2017] , or refer to REMOVAL [09/2017 - ]
Result:
OK
See step 5
- Inspect the starter assembly.
- CHECK HARNESS AND CONNECTOR (ST RELAY - STARTER ASSEMBLY)
- Remove the ST relay from the No. 1 engine room relay block.
- Disconnect the E43 starter assembly connector.
- Measure the resistance according to the value (s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 3 (ST relay holder) - E43-1 Always Below 1 Ω 3 (ST relay holder) or E43-1 - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 6
- CHECK HARNESS AND CONNECTOR (BATTERY - STARTER ASSEMBLY)
- Disconnect the cable from the negative (-) battery terminal.
- Disconnect the cable from the positive (+) battery terminal.
- Disconnect the F2 starter assembly connector.
- Measure the resistance according to the value (s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition Positive (+) battery terminal - F2-1 Always Below 1 Ω Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 7
- CHECK HARNESS AND CONNECTOR (ST RELAY - BODY GROUND)
- Remove the ST relay from the No. 1 engine room relay block.
- Measure the resistance according to the value (s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition 1 (ST relay holder) - Body ground Always Below 1 Ω Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 8
- CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - ST RELAY)
- Remove the ST relay from the No. 1 engine room relay block.
- Disconnect the E25 park/neutral position switch connector.
- Disconnect the A21 certification ECU (smart key ECU assembly) connector.
- Measure the resistance according to the value (s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition E25-5 (L) - 2 (ST relay holder) Always Below 1 Ω A21-7 (STA) - 2 (ST relay holder) Always Below 1 Ω Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 9
- CHECK HARNESS AND CONNECTOR (BATTERY - ST RELAY)
- Remove the ST relay from the No. 1 engine room relay block.
- Measure the voltage according to the value (s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition 5 (ST relay holder) - Body ground Always 11 to 14 V Result
Proceed to OK NG
Result:
OK
GO TO SMART ACCESS SYSTEM WITH PUSH-BUTTON START. Refer to HOW TO PROCEED WITH TROUBLESHOOTING [10/2015 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- INSPECT PARK/NEUTRAL POSITION SWITCH
- Inspect the park/neutral position switch.
Refer to INSPECTION [10/2015 - ]
Result
Proceed to OK NG
Result:
NG
REPLACE PARK/NEUTRAL POSITION SWITCH. Refer to REMOVAL [10/2015 - ]
Result:
OK
See step 11
- Inspect the park/neutral position switch.
- CHECK HARNESS AND CONNECTOR (PARK/NEUTRAL POSITION SWITCH - ECM - ST RELAY - CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - TCM)
- Disconnect the E25 park/neutral position switch connector.
- Disconnect the A13 ECM connector.
- Remove the ST relay from the No. 1 engine room relay block.
- Disconnect the A21 certification ECU (smart key ECU assembly) connector.
- Disconnect the A28 TCM connector.
- Measure the resistance according to the value (s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition E25-5 (L) - A13-20 (STA) Always Below 1 Ω E25-5 (L), A13-20 (STA), 2 (ST relay holder), A21-7 (STA) or A28-15 (STA) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
Result:
OK
See step 12
- CHECK HARNESS AND CONNECTOR (CERTIFICATION ECU (SMART KEY ECU ASSEMBLY) - PARK/NEUTRAL POSITION SWITCH - ECM)
- Disconnect the A21 certification ECU (smart key ECU assembly) connector.
- Disconnect the E25 park/neutral position switch connector.
- Disconnect the A13 ECM connector.
- Measure the resistance according to the value (s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition A21-5 (STAR) - E25-4 (B) Always Below 1 Ω A21-5 (STAR) - A13-31 (NSW) Always Below 1 Ω A21-5 (STAR), E25-4 (B) or A13-31 (NSW) - Body ground and other terminals Always 10 kΩ or higher Result
Proceed to OK NG
Result:
OK
GO TO SMART ACCESS SYSTEM WITH PUSH-BUTTON START. Refer to HOW TO PROCEED WITH TROUBLESHOOTING [10/2015 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- READ VALUE USING TECHSTREAM (STARTER SIGNAL)
- Connect the Techstream to DLC3.
- Turn the engine switch on (IG).
- Turn the Techstream on.
- Enter the following menus: Powertrain / Engine / Data List / Primary / Starter Signal.
Powertrain > Engine > Data List
Tester Display Starter Signal - Check the value displayed on the Techstream when the engine switch is turned on (IG) and the engine is started.
OK
Condition Techstream Display (Starter Signal) Engine switch on (IG) OFF Engine started ON Result
Proceed to OK NG
Result:
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE. Refer to PROBLEM SYMPTOMS TABLE [10/2015 - 05/2018] , or refer to PROBLEM SYMPTOMS TABLE [05/2018 - ]
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR (ST RELAY - ECM)