Installation [09/2014 - ]: Procedure
- INSTALL NO. 2 INTEGRATION RELAY
- Connect the 3 connectors.
- Attach the 2 claws to install the No. 2 integration relay.
- INSTALL NO. 1 RELAY BLOCK COVER
- Attach the 3 claws.
- Attach the 2 clamps and install the No. 1 relay block cover.
- INSTALL COOL AIR INTAKE DUCT SEAL
Refer to PROCEDURE - Step 117 Refer to PROCEDURE - Step 116
- INSTALL ENGINE ROOM SIDE COVER
Refer to PROCEDURE - Step 118 Refer to PROCEDURE - Step 117
- CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL NOTE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See article. Refer to INITIALIZATION [09/2014 - 10/2015] Refer to INITIALIZATION [10/2015 - ] ).
- INSTALL LUGGAGE COMPARTMENT TRIM COVER LH
Refer to PROCEDURE - Step 24
- INSTALL LUGGAGE COMPARTMENT FLOOR MAT
Refer to PROCEDURE - Step 26