Installation [09/2014 - 10/2015]: Procedure
- INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY
- Engage the 2 claws to install the integration control and panel assembly.
- INSTALL NO. 1 INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
Refer to PROCEDURE - Step 26
- INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
Refer to PROCEDURE - Step 27
- INSTALL NO. 1 INSTRUMENT PANEL GARNISH SUB-ASSEMBLY
Refer to PROCEDURE - Step 28
- INSTALL INSTRUMENT SIDE PANEL LH
Refer to PROCEDURE - Step 29
- INSTALL INSTRUMENT PANEL FINISH PANEL END LH
Refer to PROCEDURE - Step 6
- INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL
Refer to PROCEDURE - Step 8
- INSTALL FRONT DOOR OPENING TRIM COVER LH
Refer to PROCEDURE - Step 31
- INSTALL FRONT DOOR SCUFF PLATE LH
Refer to PROCEDURE - Step 33