Combination Meter ECU Communication Stop Mode [09/2014 - 10/2015]: Procedure
- CHECK FOR OPEN IN CAN BUS WIRE (COMBINATION METER ASSEMBLY CAN BRANCH WIRE)
- Disconnect the cable from the negative (-) battery terminal.
- Disconnect the combination meter assembly connector.
- Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N40-28 (CANH) - N40-29 (CANL) Cable disconnected from negative (-) battery terminal 54 to 69 Ω TEXT IN ILLUSTRATION*a Rear view of wire harness connector
(to Combination Meter Assembly)
Result:
NG
REPAIR OR REPLACE COMBINATION METER ASSEMBLY CAN BRANCH WIRE OR CONNECTOR (CANH, CANL)
Result:
OK
See step 2
- Disconnect the cable from the negative (-) battery terminal.
- CHECK HARNESS AND CONNECTOR (COMBINATION METER ASSEMBLY - BATTERY AND BODY GROUND)
- Connect the cable to the negative (-) battery terminal.NOTE:
When connecting the cable, some systems need to be initialized after the cable is reconnected (Refer to INITIALIZATION [09/2014 - 10/2015] ).
- Measure the voltage according to the value(s) in the table below.
Standard Voltage
Tester Connection Condition Specified Condition N40-22 (B) - Body ground Always 11 to 14 V N40-21 (IG+) - Body ground Engine switch on (IG) 11 to 14 V - Measure the resistance according to the value(s) in the table below.
Standard Resistance
Tester Connection Condition Specified Condition N40-30 (ES) - Body ground Always Below 1 Ω TEXT IN ILLUSTRATION*a Rear view of wire harness connector
(to Combination Meter Assembly)
Result:
OK
REPLACE COMBINATION METER ASSEMBLY
(Refer to REMOVAL [09/2014 - ] )
Result:
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
- Connect the cable to the negative (-) battery terminal.