LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2015 >> IS 250C Base >> Repair and Diagnosis (Single Page) >> Steering >> Steering Column >> Steering Lock System (Diagnostic Codes & Circuit Tests) >> Steering Lock System >> DTC B2782: Power Source Control ECU Malfunction [08/2013 - ] >> Procedure

DTC B2782: Power Source Control ECU Malfunction [08/2013 - ]: Procedure

  1. INSPECT STEERING LOCK ACTUATOR ASSEMBLY (STEERING LOCK ECU) 
    1. Measure the voltage according to the value(s) in the table below.
      GTY258030Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002

      Standard Voltage

      Tester Connection Condition Specified Condition
      J29-3 (IGE) - J29-1 (GND) Specified condition is checked after performing the following:
      1. Turn the engine switch off
      2. Turn the engine switch on (ACC or IG)
      • Motor activated: Below 1 V
      • Motor not activated: 10 to 12 V
      J29-3 (IGE) - J29-1 (GND) Specified condition is checked after performing the following:
      1. Move the shift lever to P
      2. Turn the engine switch off
      3. Open the driver's door
      • Motor activated: Below 1 V
      • Motor not activated: 10 to 12 V
      TEXT IN ILLUSTRATION

      *1 Component with harness connected
      (Steering Lock Actuator Assembly)

      HINT: 

      The steering lock ECU and steering lock actuator assembly are supplied as a unit.

    NG → See step   2 

    OK → REPLACE STEERING LOCK ACTUATOR ASSEMBLY (STEERING LOCK ECU) 

  2. CHECK HARNESS AND CONNECTOR (STEERING LOCK ACTUATOR ASSEMBLY - BODY GROUND) 
    1. Disconnect the J29 connector from the steering lock actuator assembly.
      GTY257186Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *1 Front view of wire harness connector
      (to Steering Lock Actuator Assembly)
    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      J29-1 (GND) - Body ground Always Below 1 Ω

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK: Go to next step 

  3. CHECK HARNESS AND CONNECTOR (STEERING LOCK ACTUATOR ASSEMBLY - POWER SOURCE CONTROL ECU) 
    1. Disconnect the J55 connector from the power source control ECU.
      GTY254103Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
      TEXT IN ILLUSTRATION

      *1 Front view of wire harness connector
      (to Steering Lock Actuator Assembly)
      *2 Front view of wire harness connector
      (to Power Source Control ECU)
    2. Measure the resistance according to the value(s) in the table below.

      Standard Resistance

      Tester Connection Condition Specified Condition
      J29-3 (IGE) - J55-32 (SLR+) Always Below 1 Ω
      J29-3 (IGE) - Body ground Always 10 kΩ or higher

    NG → REPAIR OR REPLACE HARNESS OR CONNECTOR 

    OK → See step   4 

  4. REPLACE POWER SOURCE CONTROL ECU. Refer to  REMOVAL [08/2013 - ]