Purge Valve: Installation: Installation
- INSTALL PURGE VSV
- Install the purge VSV with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Connect the 2 purge line hoses to the purge VSV.
- Connect the purge VSV connector.
- Install the purge VSV with the bolt.
- CONNECT ENGINE WIRE . Refer to INSTALLATION - Step 5
- INSTALL AIR CLEANER CAP LH
- Install the air cleaner cap LH.
- INSTALL AIR CLEANER CAP RH
- Install the air cleaner cap RH.
- INSTALL INTAKE AIR CONNECTOR PIPE . Refer to INSTALLATION - Step 2
- INSTALL NO. 1 AIR CLEANER INLET . Refer to INSTALLATION - Step 3
- INSTALL V-BANK COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 8
- INSTALL ENGINE ROOM SIDE COVER LH . Refer to INSTALLATION - Step 103
- INSTALL ENGINE ROOM SIDE COVER RH . Refer to INSTALLATION - Step 102
- INSTALL AIR CLEANER INLET COVER . Refer to INSTALLATION - Step 7
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .
- INSTALL COWL TOP VENTILATOR LOUVER RH . Refer to INSTALLATION - Step 17