Exhaust Manifold: Installation: Installation
WARNING: This page is about a different car, the 2012 Lexus IS 350C. However, it is still accessible from the selected car via links, so may be relevant.
- INSTALL AIR FUEL RATIO SENSOR (for Bank 2 Sensor 1) . Refer to INSTALLATION - Step 1
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY LH
- Install a new gasket as shown in the illustration.
- Install the exhaust manifold sub-assembly LH with 6 new nuts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
NOTE:- Do not damage the stud bolts when installing the exhaust manifold.
- Be sure to tighten either of nuts A first as show in the illustration.
- Connect the air fuel ratio sensor connector (for Bank 2 Sensor 1).
- INSTALL NO. 3 ENGINE ROOM RELAY BLOCK
- Install the No. 3 engine room relay block with the bolt and nut.
Torque: 8.0 N*m (82 kgf*cm, 71 in.*lbf)
- Install the earth wire with the 2 bolts.
Bolt A
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
Bolt B
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Install the No. 3 engine room relay block with the bolt and nut.
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH
- Install a new gasket as shown in the illustration.
- Install the exhaust manifold sub-assembly RH with 6 new nuts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
NOTE:- Do not damage the stud bolts when installing the exhaust manifold.
- Be sure to tighten either of nuts A first as show in the illustration.
- INSTALL AIR FUEL RATIO SENSOR (for Bank 1 Sensor 1) . Refer to INSTALLATION - Step 4
- INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE . Refer to INSTALLATION - Step 16
- INSTALL BATTERY TRAY . Refer to INSTALLATION - Step 6
- INSTALL POWER STEERING ECU ASSEMBLY
- Install the power steering ECU assembly. Refer to INSTALLATION .
- INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE . Refer to INSTALLATION - Step 2
- INSTALL V-BANK COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 78
- INSTALL ENGINE ROOM SIDE COVER LH . Refer to INSTALLATION - Step 79
- INSTALL ENGINE ROOM SIDE COVER . Refer to INSTALLATION - Step 80
- INSTALL COOL AIR INTAKE DUCT SEAL . Refer to INSTALLATION - Step 81
- INSTALL FRONT EXHAUST PIPE ASSEMBLY See step 4
- INSTALL FRONT CENTER FLOOR BRACE
- Install the front center floor brace with the 4 bolts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 17 N*m (173 kgf*cm, 13 ft.*lbf)
- Install the front center floor brace with the 4 bolts.
- INSTALL REAR BODY SUPPORT BRACKET
- Install the 2 rear body support brackets with the 12 bolts except (A).
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 17 N*m (173 kgf*cm, 13 ft.*lbf)
- Install the 2 bolts (A).
Torque: 17 N*m (173 kgf*cm, 13 ft.*lbf)
- Install the 2 rear body support brackets with the 12 bolts except (A).
- INSTALL NO. 2 ENGINE UNDER COVER
- INSTALL NO. 1 BODY MOUNTING BRACKET SUB-ASSEMBLY LH . Refer to INSTALLATION - Step 71
- INSTALL NO. 1 BODY MOUNTING BRACKET SUB-ASSEMBLY RH . Refer to INSTALLATION - Step 72
- INSTALL NO. 1 FLOOR UNDER COVER . Refer to INSTALLATION - Step 73
- INSTALL NO. 2 FLOOR UNDER COVER . Refer to INSTALLATION - Step 74
- INSTALL FRONT FLOOR COVER LH . Refer to INSTALLATION - Step 75
- INSTALL FRONT FLOOR COVER RH . Refer to INSTALLATION - Step 76
- INSTALL ENGINE UNDER COVER
- INSPECT FOR EXHAUST GAS LEAK