LEMON Manuals: Even more car manuals for everyone
Home >> Lexus >> 2009 >> LS 600hL >> Repair and Diagnosis >> External Pages >> Different car >> Section 13 (Emission Control) >> Canister >> Installation

Section 13 (Emission Control): Canister: Installation

WARNING: This page is about a different car, the 2008 Lexus LS 600hL. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL CANISTER 
    1. Connect the fuel tank vent hose labeled A.
      1. Connect the fuel tank vent hose as shown in the illustration (1). Then push down the retainer to lock the claws as shown in the illustration (2).
        NOTE:
        • Check that there are no scratches or foreign objects around the connected part of the fuel tank vent hose connector and charcoal canister before performing this work.
        • After connecting the fuel tank vent tube, check that the fuel tank vent hose is securely connected by pulling the fuel tank vent hose connector and charcoal canister.
          Fig 1: Connecting Fuel Tank Vent Hose Labeled
          G05773147Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the air inlet line hose labeled B shown in the illustration to the leak detection pump.
    3. Fig 2: Locating Leak Detection Pump Connector
      G05773138Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    4. Connect the purge line hose labeled C shown in the illustration.
    5. Attach the 2 wire harness clamps and connect the connector
    6. Install the charcoal canister with the 4 bolts and 2 plastic nuts.

      Torque: for bolt 

      21 N*m (215 kgf*cm, 15 ft.*lbf) 

      Fig 3: Locating Canister Bolts And Plastic Nuts
      G05773137Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    7. Connect the fuel tank vent hose to the clamp labeled A shown in the illustration.
    8. Fig 4: Locating Fuel Tank Vent Hoses
      G05773136Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    9. Connect the air inlet line hose (connected to the leak detection pump) labeled B shown in the illustration to the air inlet line tube
    10. Connect the purge line hose labeled C shown in Fig 4.
  2. INSTALL FLOOR NO. 1 UNDER COVER 
    1. Install the under cover with the 5 nuts and 5 clips.
    2. Fig 5: Locating Floor No. 1 Under Cover Hole Plugs, Nuts And Clips
      G05773135Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Install the 2 hole plugs.