PCV Valve: Installation: Installation
NOTE:
While the negative battery terminal is connected, even if the power switch is OFF, the brake control system activates when the brake pedal is depressed or the door courtesy switch turns on. Therefore during servicing of the brake system components, do not operate the brake pedal or open/close the doors while the negative battery terminal is connected.
- INSTALL PCV VALVE
- Install the PCV valve.
Torque: 5.0 N.m (51 kgf*cm, 44 in.*lbf)
HINT:
When reusing the PCV valve, inspect the O-ring.
If the O-ring has scratches or cuts, replace the PCV valve.
- Connect the PCV hose.
- Install the PCV valve.
- INSTALL INTAKE MANIFOLD . Refer to INSTALLATION - Step 1
- CONNECT PCV HOSE . Refer to INSTALLATION - Step 2
- INSTALL PURGE VSV . Refer to INSTALLATION - Step 3
- INSTALL WATER BY-PASS PIPE HOSE . Refer to INSTALLATION - Step 4
- INSTALL THROTTLE BODY ASSEMBLY . Refer to INSTALLATION - Step 1
- INSTALL NO. 3 ENGINE COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 7
- INSTALL ENGINE MOTOR CABLE CLAMP BRACKET . Refer to INSTALLATION - Step 7
- INSTALL FLEXIBLE HOSE BRACKET SUB-ASSEMBLY . Refer to INSTALLATION - Step 8
- INSTALL INJECTOR DRIVER . Refer to INSTALLATION - Step 9
- CONNECT ENGINE WIRE HARNESS . Refer to INSTALLATION - Step 10
- CONNECT ECM CONNECTOR . Refer to INSTALLATION - Step 11
- INSTALL NO. 2 CONNECTOR HOLDER . Refer to INSTALLATION - Step 12
- CONNECT HYBRID VEHICLE CONTROL ECU CONNECTOR . Refer to INSTALLATION - Step 13
- INSTALL OUTLET ENGINE ROOM ECM DUCT . Refer to INSTALLATION - Step 46
- INSTALL ENGINE ROOM ECU COVER . Refer to INSTALLATION - Step 4
- INSTALL NO. 6 COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 19
- INSTALL ENGINE COVER SUB-ASSEMBLY LH . Refer to INSTALLATION - Step 20
- INSTALL SKID CONTROL ECU BRACKET . Refer to INSTALLATION - Step 1
- CONNECT BRAKE FLUID RESERVOIR . Refer to INSTALLATION - Step 2
- CONNECT NO. 3 RELAY BLOCK . Refer to INSTALLATION - Step 17
- INSTALL SKID CONTROL ECU . Refer to INSTALLATION - Step 4
- CONNECT NO. 1 MOTOR COOLING PIPE . Refer to INSTALLATION - Step 5
- INSTALL AIR CLEANER ASSEMBLY RH . Refer to INSTALLATION - Step 2
- INSTALL AIR CLEANER ASSEMBLY LH . Refer to INSTALLATION - Step 1
- INSTALL INTAKE AIR CONNECTOR PIPE . Refer to INSTALLATION - Step 2
- INSTALL SERVICE PLUG GRIP . Refer to INSTALLATION - Step 1
- INSTALL BATTERY SERVICE HOLE COVER . Refer to INSTALLATION - Step 15
- INSTALL BATTERY SERVICE HOLE COVER LH . Refer to INSTALLATION - Step 16
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL NOTE: When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .
- INSTALL LUGGAGE COMPARTMENT MAT SUB-ASSEMBLY . Refer to INSTALLATION - Step 18
- ADD ENGINE COOLANT . Refer to REPLACEMENT - Step 6
- INSPECT FOR COOLANT LEAK . Refer to ON-VEHICLE INSPECTION - Step 1
- CHECK FUNCTION OF THROTTLE BODY . Refer to ON-VEHICLE INSPECTION - Step 1
- CHECK AND CLEAR DTC . Refer to INSTALLATION - Step 11
- PERFORM TEST MODE INSPECTION . Refer to INSTALLATION - Step 14
- INSTALL NO. 1 ENGINE UNDER COVER . Refer to INSTALLATION - Step 84
- INSTALL FRONT WHEEL OPENING EXTENSION PAD RH . Refer to INSTALLATION - Step 14
- INSTALL FRONT WHEEL OPENING EXTENSION PAD LH . Refer to INSTALLATION - Step 13
- INSTALL NO. 1 AIR CLEANER INLET . Refer to INSTALLATION - Step 95
- INSTALL ENGINE ROOM SIDE COVER LH . Refer to INSTALLATION - Step 92
- INSTALL ENGINE ROOM SIDE COVER RH . Refer to INSTALLATION - Step 93
- INSTALL AIR CLEANER INLET COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 96
- INSTALL V-BANK COVER SUB-ASSEMBLY . Refer to INSTALLATION - Step 97