STARTER (for 2WD): Installation
- INSTALL STARTER ASSEMBLY
- Install the flywheel housing side cover.
- Install the terminal lower cover with the nut.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the starter with the 2 bolts.
Torque: 37 N*m (377 kgf*cm, 27 ft.*lbf)
NOTE: Make sure the flywheel housing cover is as shown in the illustration. - Install the wire harness with the nut.
Torque: 9.8 N*m (100 kgf*cm, 88 in.*lbf)
- Connect the starter connector.
- Install the terminal upper cover.
- INSTALL NO. 3 EXHAUST MANIFOLD HEAT INSULATOR
- Install the heat insulator with the 3 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the heat insulator with the 3 bolts.
- INSTALL EXHAUST MANIFOLD SUB-ASSEMBLY RH (See INSTALLATION )
- INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR (See INSTALLATION )
- INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE (See INSTALLATION )
- INSTALL FRONT SUSPENSION MEMBER REINFORCEMENT RH
- Install the front suspension member reinforcement with the 4 bolts.
Torque: 50 N*m (510 kgf*cm, 39 ft.*lbf)
- Install the front suspension member reinforcement with the 4 bolts.
- INSTALL ENGINE UNDER COVER RH
- Install the engine under cover with the clip and screw.
- CONNECT FRONT STABILIZER BAR (See INSTALLATION )
- INSTALL ENGINE UNDER COVER REAR RH (See INSTALLATION )
- INSTALL ENGINE UNDER COVER REAR LH (See INSTALLATION )
- INSTALL FRONT EXHAUST PIPE ASSEMBLY
- Install the front exhaust pipe (see INSTALLATION ).
- INSTALL GENERATOR ASSEMBLY
- Install the generator (see INSTALLATION ).
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- INSTALL COWL TOP VENTILATOR LOUVER RH (See INSTALLATION )
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).