Purge Valve: Installation
- INSTALL PURGE VSV
- Install the purge VSV with the bolt.
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Connect the 2 hoses and connector.
- Install the purge VSV with the bolt.
- INSTALL V-BANK COVER
- Install the cover the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the cover the 2 nuts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see INITIALIZATION
.NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see INITIALIZATION
.